Our Platform • Phase 01

Project Development

From Greenfield to Shovel-Ready. We handle all development complexity—land, grid, permits, offtake—so you enter with zero risk.

30+

Projects Developed

Across India, Africa & Europe

6-9

Months Development Time

From site ID to RTB

1,500+

Acres Secured

For solar development

98%

Permit Success Rate

First-time approvals

Why Development Matters

Development is where projects succeed or fail. In India alone, over 40% of solar projects face land title disputes, permit delays, or grid connectivity issues that erode returns and extend timelines by 12-18 months.

Soleos absorbs all development risk internally. Our in-house teams handle site selection, land aggregation, regulatory approvals, grid connectivity, and offtake structuring—delivering shovel-ready projects where investors and consumers enter at the construction stage with all risks eliminated.

The result: 6-9 months from greenfield to construction-ready, compared to the industry average of 18-24 months.

Development Process

6 Phases to Shovel-Ready

Our systematic approach compresses development timelines while eliminating risk at every stage.

01

Site Identification & Selection

Month 1-2

Scientific site selection using advanced analytics and ground verification.

Key Activities

  • GIS-based solar irradiance mapping (>5.5 kWh/m²/day threshold)
  • Satellite imagery analysis for terrain and access
  • Proximity analysis to grid infrastructure (<10km preferred)
  • Topographical survey and soil assessment
  • Stakeholder and community engagement
Output:Validated site with technical feasibility confirmed
02

Land Acquisition & Title Verification

Month 2-4

Rigorous due diligence to eliminate title risk completely.

Key Activities

  • 30-year retrospective title search at Tehsil level
  • Revenue record verification (7/12, 8A, mutation entries)
  • Encumbrance certificate from Sub-Registrar
  • Multi-layer ownership validation for fragmented holdings
  • Lease structuring with registration and stamp duty
Output:Clean title with insured land rights
03

Grid Feasibility & Interconnection

Month 2-4

Early engagement with transmission utilities to secure injection capacity.

Key Activities

  • STU/CTU connectivity application and pre-approval
  • Injection capacity reservation at nearest substation
  • Transmission corridor assessment and planning
  • Grid stability and power quality analysis
  • Bay allocation and metering arrangements
Output:Confirmed grid connectivity with allocated capacity
04

Regulatory & Environmental Approvals

Month 3-6

Parallel processing of all permits to compress timelines.

Key Activities

  • CLU (Change of Land Use) from Revenue Department
  • CEIG (Chief Electrical Inspector) approval
  • Environmental clearance (EIA screening)
  • Forest clearance (FC-I/FC-II if applicable)
  • State-specific generation licenses and registrations
Output:All permits in place for construction
05

Offtake Structuring

Month 4-7

Bankable power purchase agreements with creditworthy offtakers.

Key Activities

  • PPA negotiation with C&I consumers or DISCOMs
  • Tariff optimization and escalation structuring
  • Payment security mechanisms (LC, escrow, guarantee)
  • Scheduling and forecasting obligations
  • Bankability review with lender panel
Output:Signed PPA with payment security in place
06

Ready-to-Build Handover

Month 8-9

Complete project package ready for investor entry and construction.

Key Activities

  • Comprehensive documentation and data room
  • Technical due diligence package (LDTE, IE report)
  • Legal due diligence completion certificate
  • Pre-approved financing from lender panel
  • Construction-ready with mobilization timeline
Output:Shovel-ready project for investor/consumer entry

Our Capabilities

Built-In Development Infrastructure

In-house capabilities that eliminate external dependencies and accelerate timelines.

In-house Land Team

25+ professionals across India specializing in land aggregation, title verification, and lease structuring.

Regulatory Expertise

Active presence in 12+ states with established relationships with STUs, DISCOMs, and regulatory authorities.

Legal Framework

Panel of 15+ law firms for title opinions, contract drafting, and dispute resolution across jurisdictions.

Technical Validation

PE-stamped designs, third-party engineering reviews, and bankability assessments for every project.

Risk Mitigation

How We Eliminate Development Risk

Every common development pitfall has a Soleos solution built into our process.

RiskIndustry ProblemSoleos Solution
Land Title Disputes40% of projects face title challenges post-construction30-year title search, title insurance, escrow-based payments
Permit Delays12-18 months average for all approvalsParallel processing achieves 6-9 months with 98% success
Grid Rejection30% of STU applications rejected or delayedPre-feasibility studies and early STU engagement
Offtake UncertaintyConstruction starts with unsigned PPAs100% contracted with payment security before handover
Cost OverrunsDevelopment costs escalate due to delaysFixed development fee with milestone-based payments

Geographic Presence

Where We Develop

Active development capabilities across high-potential renewable energy markets.

India

Primary development hub

GujaratMaharashtraBiharChhattisgarh

Africa

Emerging markets expansion

Democratic Republic of CongoZimbabweZambiaKenyaGhana

Europe

Strategic partnerships

SpainPortugal

Asia-Pacific

Market entry

Philippines

Americas

Growth market

Brazil

Our Track Record

Development Portfolio

Proven delivery across markets with projects completed and actively under development.

Development Completed

Chhattisgarh, India

Solar

30 MW

Operational

Gujarat (Mehsana), India

Solar

30 MW

Operational

DRC (Lubumbashi)

Solar + Storage

248 MW + 50 MW BESS

Operational

Spain (Seville)

Solar + Storage

50 MW + 80 MW BESS

Operational

Under Development

Maharashtra (Sangli), India

Solar

214 MW

In Development

Gujarat (Kutch), India

Solar

100 MW

In Development

Bihar (Gaya), India

Solar

84 MW

In Development

Zimbabwe (Bulawayo & Harare)

Solar

130 MW

In Development

Philippines (Murcia)

Solar

95 MW

In Development

Spain (Seville)

Solar + Storage

50 MW + 80 MW BESS

In Development

Brazil (Bahia)

Solar

308 MW

In Development

Pipeline data as of January 2026. Contact us for current project availability and partnership opportunities.